What type of process flow structure is CBF using? CBF use the batch process flow diagram. Products are produced in batches of a specific size using a batch process flow structure, with each batch traveling through the manufacturing process and structure. The batch process is distinguished by a sequential flow of operations in which distinct techniques are consistent across all of the products (""Process Flow Structure"", 2007). CBF's manufacturing procedure adheres to certain Batch technique criteria.

2. Diagram the process in a manner similar to Exhibit 7.7.

Order

Acceptance

Material from supplier

Board fabrication

Move to

Clean Process

NC

Machine

Programming

Move to

Coat Process

Move to

Expose Process

Move to

Develop Process

Move to

Inspection

Process

Move to

Bake Department

Move to

Drilling Process

Move to

Copper Plate Process

Move to

Final Step

Move to

Shipping Department

3. Analyze the capacity of the process.

Process analysis comprises of several capacity adjustments in various parts of the production activity to minimize costs and maximize outputs using the resources available ("Process Flow Structure", 2007). The CBF’s plant was established to produce one thousand boards each day running for an eight-hour shift per day for five days every week. CBF supplies circuit boards from their production plant to various huge technology-device providers like Hewlett-Packard and Apple Company (Ritzman & Klassen, 2007). The manufacturing process of CBF comprises of twenty two workers working an eight hour shift each day. The batch process of the organization runs at a rate of 9.92 minutes per part (Ritzman & Klassen, 2007). However, the process has several disadvantages. In the first categories of the manufacturing process, specifically during the first inspection, fifteen percent of the products are rejected. Moreover, during the final test of the boards, an additional five percent of the boards are rejected. These rejections interfere with the capacity of the manufacturing process of the CBF.

4. What is the impact of losses in the process in Inspection and Final Test?

The various products’ loss experienced in CBF’s manufacturing process of circuit boards occurs in the boards’ inspection and final tests. These losses have a huge impact to the number of boards produced since they reduce the overall capacity of the products produced by CBF. According to the statistics, CBF accounts for twenty-five percent losses in every batch. With a single batch comprising of sixty boards, the company is forced to increase the order by twenty-five percent (Ritzman & Klassen, 2007). Therefore, in order to effectively produce a single order of sixty boards, the company has to commence the manufacturing process with seventy-five circuit board blanks. The loss arises from the fifteen percent losses that occur in the inspection test and the five percent loss that occurs in the final test (Ritzman & Klassen, 2007). For every order, CBF loses fifteen circuit boards. Therefore, for every one thousand boards presented in the manufacturing process, CBF produces only seven hundred and fifty boards as final products. This means that for every one thousand boards injected in the manufacturing process, two hundred and fifty boards are lost due to rejections in the two tests. This is a huge loss since it increases the production cost of the boards produced each day.

5. What recommendations would you make for a short-term solution to CBF’s problems?

As a short-term solution to CBF’s manufacturing process, I would recommend that the company check the efficiency of each and every machine operating in the first four levels of the processes. The initial four levels seem to be the major cause of the fifteen percent loss that occurs in the whole manufacturing process. I would recommend that the organization seek skilled technicians who will be monitoring the performance of the machines and making various improvements to ensure that the machines are working efficiently constantly.

6. What long-term recommendations would you make?

As a long-term solution, I would advise CBF to increase the number of machines at each stage of production to reduce tear and wear of machines. In stages with only one machine, the machines are overloaded, and this leads to quickened wearing of the machines which ultimately reduces inefficiency. Therefore, increasing the number of machines will ensure that all machines perform efficiently for a long duration of time.

References

Process Flow Structure. (2007). Netmba.com. Retrieved on 10 June 2017, from http://www.netmba.com/operations/process/structure/

Ritzman, L., & Klassen, R. (2007). Foundations of operations management (1st ed., pp. 163-164). Pearson Prentice Hall.

February 01, 2023
Category:

Education Economics

Subcategory:

Learning Workforce

Number of pages

3

Number of words

725

Downloads:

63

Writer #

Rate:

4.4

Expertise Structure
Verified writer

RiaSm02 is great for all things related to education. Sharing a case study that I could not understand for the life of mine, I received immediate help. Great writer and amazing service that won’t break the bank!

Hire Writer

This sample could have been used by your fellow student... Get your own unique essay on any topic and submit it by the deadline.

Eliminate the stress of Research and Writing!

Hire one of our experts to create a completely original paper even in 3 hours!

Hire a Pro